|
2007-2009 |
DFS Karlsruhe ATCC (Germany)
and
EUROCONTROL
MUAC (Maastricht, Netherlands) |
Provision of the ATN/FANS Datalink Front-End Processor (DL-FEP system, Test System and ASIS) for operation in the scope of the Single European Sky Data Link Implementing Rule (entry into operation in 2011)
Supports CM, CPDLC & PM-CPDLC.
|
|
2005-2007 |
EUROCONTROL
EHQ (Brussels, Belgium)
and
AIRBUS (Toulouse, France) |
Prototyping of PM-CPDLC, PM-ADS and PM-FIS using the air and ground ATN End System in support of ICAO standard validation.
|